  • Why doesn't the Average-Time command work?
  • How can I make sure that AKTAKOM ATK-6010 phase interlacing pointer operates correctly?
  • How can I know when the battery should be replaced when operating AKTAKOM ACM-6060 tester?

  • Why doesn't the Average-Time command work?
    The Averange-Time command has been renamed to IMP NUMS - the number of pulses in one test.

    Up

    How can I make sure that AKTAKOM ATK-6010 phase interlacing pointer operates correctly?

    In order to check the correct operation of AKTAKOM ATK-6010 phase interlacing pointer connect it to the network with the correct phase sequence and make sure the pointer turns in the line of the arrow.

    1. Connect ATK-6010 to the phases of three-phase network with the test leads and alligator clips.
    2. If the pointer turns in the line of the arrow the order of sequence is as follows: R (red) – S (yellow) – T (Green).

    ATK-6010 can be also used in the horizontal condition (slope angle is ±15° at max.). Failure to meet this condition can cause the turning pointer defect and wrong test results.


    Up

    How can I know when the battery should be replaced when operating AKTAKOM ACM-6060 tester?

    ACM-6060 tester has an indicator of low battery charge. It appears in the left up corner of the LCD. However measurement may still be made for several hours after low battery indicator appears.

    To replace the battery take the following steps:

    1. Loose the screw for battery cover, take the battery cover away from the tester and remove the battery.
    2. Replace it with 9V battery (Alkaline or heavy duty type) and reinstate the cover making sure the battery cover is secured well after the battery replacement.